Where the constraint appears
Schematic layout, not geographic. G = generator. Purple ring = facility connection.
Every bus, against the baseline
Filled markers = selected interval; gray markers = public baseline. Shaded area is the chosen voltage band.
What this result means
Failed checks in this interval
Compare service, constraints and cost
Worst electrical value over the entire event. Reduced-load and full-load options serve different objectives; no automatic “cheapest” recommendation is made.
| Scenario | Facility MW | Full request? | Min pu | Max % | Screen | Capex $M* |
|---|
*Synthetic capital assumptions. Does not include all project costs or establish economic feasibility. Battery passes apply to this event only.
Electrical results and assumptions
Branches — both ends checked
| Branch | From MVA | To MVA | RATE_A MVA | Loading % |
|---|
Generator dispatch and limits
| Bus | P MW | P min / max | Q MVAr | Q min / max |
|---|
P and Q limits are screened after solving. The program does not enforce Q limits by switching PV buses to PQ; any violated generator limit fails the screen.
Cost components and exclusions
Reproduction and model provenance
Run from the extracted project:
python -m gridconnect run --config configs/demo.json --out outputs
This report displays precomputed solver results. Change the JSON configuration and rerun Python to calculate a new study. No electrical equations are approximated in the browser.